Engineering management: board exam questions with solutions
On the ECE exam under General Engineering and Applied Sciences (GEAS) and the REE exam under Engineering Sciences and Allied Subjects (ESAS). Try each question before you open its solution.
Loading the reviewer… (it needs JavaScript)
Questions
1. Which management function measures actual performance against standards and takes corrective action?
- Planning
- Organizing
- Staffing
- Controlling
Show the answer and solution
Answer: D. Controlling
Controlling sets standards, measures performance, compares it with the standards and corrects deviations.
2. What does a Gantt chart mainly show?
- The organization's reporting lines
- Cash inflows and outflows
- Quality defects by cause
- Project tasks as bars on a time scale
Show the answer and solution
Answer: D. Project tasks as bars on a time scale
A Gantt chart plots each activity as a horizontal bar against calendar time, showing its start, duration and finish.
3. Activities A (3 days) and B (5 days) both start at time zero. C (4 days) follows both A and B, and D (7 days) follows A only. What is the project duration?
- 9 days, path B–C
- 10 days, path A–D
- 19 days, sum of all activities
- 7 days, path A–C
Show the answer and solution
Answer: B. 10 days, path A–D
Path lengths: A–D = 3 + 7 = 10, B–C = 5 + 4 = 9 and A–C = 3 + 4 = 7. The longest (critical) path is A–D at 10 days.
4. A PERT activity has optimistic 4 days, most likely 6 days and pessimistic 14 days. What is its expected time?
- 8 days
- 7 days
- 6 days
- 24 days
Show the answer and solution
Answer: B. 7 days
t_e = (a + 4m + b)/6 = (4 + 24 + 14)/6 = 42/6 = 7 days. 8 days is the plain average of the three estimates.
5. In Maslow's hierarchy of needs, which needs are at the base?
- Physiological
- Safety
- Esteem
- Self-actualization
Show the answer and solution
Answer: A. Physiological
From bottom to top, the levels are physiological, safety, love/belonging, esteem and self-actualization.
6. In management, what does 'span of control' refer to?
- The number of levels in the hierarchy
- A manager's budget limit
- The number of subordinates who report directly to one manager
- The time allowed to finish a project
Show the answer and solution
Answer: C. The number of subordinates who report directly to one manager
Span of control is how many people one supervisor directly manages. A wide span gives a flatter organization.
7. In a SWOT analysis for a local ISP, where does a new national competitor entering the city belong?
- Weakness
- Opportunity
- Threat
- Strength
Show the answer and solution
Answer: C. Threat
Threats are external factors that could hurt the firm. Strengths and weaknesses are internal factors.
8. A project's critical path has an expected duration of 20 days and a standard deviation of 2 days. Assuming a normal distribution, what is the probability of finishing within 22 days?
- 84.13%
- 68.27%
- 50.00%
- 97.72%
Show the answer and solution
Answer: A. 84.13%
z = (22 − 20)/2 = 1.0, and P(Z ≤ 1) = 0.8413 = 84.13%. 97.72% corresponds to z = 2.
Other topics in the same subjects
Physics: mechanics · Physics: waves, electricity and magnetism · General chemistry · Thermodynamics · Engineering materials · Engineering economics · Computer fundamentals and programming · RA 9292 and ethics (electronics) · Fluid mechanics · Strength of materials · RA 7920 and ethics (electrical) · PEC Part 1: general requirements
An independent, free reviewer: not affiliated with the PRC or the Boards. Subject weights and passing rules are from the PRC examination programs and the laws (RA 9292, RA 7920); check the current PRC program before you file. Code questions follow the Philippine Electrical Code 2017 Part 1; check them against your own copy of the Code.