Home › Courses › Advanced PV Systems

Advanced PV Systems

Engineering · about 8 hours · 12 lessons and builds · for installers moving to grid-tie, hybrid and three-phase work

Design strings against the cold-morning window, protect and ground an array to PEC 6.90, choose between grid-tie, hybrid and AC-coupled topologies, and commission the result.

Strings and the cold window, shading, OCPD, grounding and SPDs, grid-tie / hybrid / AC-coupled / three-phase, commissioning, code.

Before you start: Solar PV Systems

Start the course in the labFree. Sign in only if you want your progress on every device.

Module 1: 1 · Strings and the cold-morning window

Module 2: 2 · Shading, bypass and blocking

Module 3: 3 · Overcurrent protection for arrays

Extra practice:

Module 4: 4 · Grounding, bonding and surge

Extra practice:

Module 5: 5 · Grid-tie

Module 6: 6 · Hybrid and AC-coupled

Module 7: 7 · Three-phase

Module 8: 8 · Commissioning and the code